Plans

Non-normative execution plans — the bridge from docs/SPEC.md (what to build) to code (in what order). The spec is canonical; a plan never overrides it.

Plan Covers Status
WALKING-SKELETON.md first vertical slice — one turn end-to-end, proving the four seams ready to start
TASK-BREAKDOWN.md crate build order (SM-003→012), wave sequencing pre-implementation
PLUGIN-DOC-PLAN.md plugin-SDK doc source, smith help, doc tooling/tests pre-implementation
AGENTIC-DEVELOPMENT.md how the project is built agentically — human touchpoints, agent roster, GitHub trail proposal, under review

Is this the whole set?

WALKING-SKELETON is the entry point for implementation — a thin slice through every layer that proves the StreamFn, EngineEvent, session-codec, and TUI seams connect before any of them is built out. TASK-BREAKDOWN is the full crate sequencing that follows once the skeleton is green. One thing is still intentionally not written, to avoid speculative planning:

Prototype evidence that de-risks all of this lives in ../../prototypes/PLAN.md.

Markdown source
File outline
# Plans

Non-normative execution plans — the bridge from `docs/SPEC.md` (what to build)
to code (in what order). The spec is canonical; a plan never overrides it.

| Plan | Covers | Status |
|------|--------|--------|
| `WALKING-SKELETON.md` | first vertical slice — one turn end-to-end, proving the four seams | ready to start |
| `TASK-BREAKDOWN.md` | crate build order (SM-003→012), wave sequencing | pre-implementation |
| `PLUGIN-DOC-PLAN.md` | plugin-SDK doc source, `smith help`, doc tooling/tests | pre-implementation |
| `AGENTIC-DEVELOPMENT.md` | how the project is built agentically — human touchpoints, agent roster, GitHub trail | proposal, under review |

## Is this the whole set?

`WALKING-SKELETON` is the entry point for implementation — a thin slice through
every layer that proves the StreamFn, EngineEvent, session-codec, and TUI seams
connect before any of them is built out. `TASK-BREAKDOWN` is the full crate
sequencing that follows once the skeleton is green. One thing is still
intentionally *not* written, to avoid speculative planning:

- **Per-crate breakdowns.** Each SM-0xx task is crate-sized; it gets decomposed
  into tested units at the start of its own wave, not now.

Prototype evidence that de-risks all of this lives in `../../prototypes/PLAN.md`.