id: NL-PLAN-C19E2C04
type: plan
title: Power popup two-zone redesign
spec: NL-SPEC-C24FF4FA
status: approved
Power popup two-zone redesign
Retired: the owner amended NL-SPEC-C24FF4FA on 2026-11-14 to equal action tiles with destructive colour and armed confirmation, not a separate danger region.
That spec is the current contract; this two-zone recipe must not be implemented.
Proposed board state: dropped.
Battery presence, safe actions, two-step confirmation, Enter/Escape and no destructive test execution remain binding in the spec.
---
id: NL-PLAN-C19E2C04
type: plan
title: Power popup two-zone redesign
spec: NL-SPEC-C24FF4FA
status: approved
---
# Power popup two-zone redesign
Retired: the owner amended `NL-SPEC-C24FF4FA` on 2026-11-14 to equal action tiles with destructive colour and armed confirmation, not a separate danger region.
That spec is the current contract; this two-zone recipe must not be implemented.
Proposed board state: dropped.
Battery presence, safe actions, two-step confirmation, Enter/Escape and no destructive test execution remain binding in the spec.